Works    Info







Construction photos (august 2021)


Construction photos (march 2022)














Opening Ceremony



Construction process
















[1] An elevated platform for the washing stations


[2] View towards the dye-station


[3] The steel structure creates an intimate enclosure around the washing station


[4] View towards the cutting stations


[5] Custom made mirror frames are placed at an angle to create surprising visual connections









Construction photo’s (december 2022)


productive garden
[1] View from the productive garden towards the public plaza  


[2] A new urban center for the neighbourhood

[2] Isometric view - neighbourhood scale
[3] Civa in relation to the Vivaqua site
[4] Integrating within the neighbourhood -  [a] Attraction Poles [b] Green Network [c] Mobility
  [5] Programme Distribution & Vertical Circulation


[6] Public programme within the existing part


[7] Renovation principles - [a] Character & Programme [b] Interventions [c] Circulation


[8] Impression of the Container Lab


[9] Mixed housing programme expressed through the vertical extension


[10] Living principles - [a] Co-Living Concept [b] Exterior Spaces [c] Common Facilities

[11] Housing typologies





[12] Front street elevation


[13] Long section


[14] Cross section


[15] View from the patio above the factory towards the tower










Restored front elevation


Existing Situation

New Situation

Lightplan entryhall


Physical model studies




[1] Raised roofscape acting as a continuation of the forest


[2] Portal within the forest


[3] A central covered plaza under which various users can come together


[4] An Icon facing the Leukermeer


[5] A pavilion towards the beach


[6] Exploded axonometric of the interior